
Lexington School for the Deaf
Problem: The school needed modern access control that met federal requirements and improved accessibility in an existing building.
What we did: Electrified retrofit hardware, an NDAA-compliant on-premises Salto access control system and two new ADA-compliant swinging doors.
Result: Hardware, access control and accessible doors delivered by one team. Read the Lexington School for the Deaf case study.

