
David H. Koch Theater, Lincoln Center
Access control, emergency alert systems and compliant wiring on the 5th floor, delivered through SPK/Lewis Construction. Read the Koch Theater project.
Access control, cameras, intercom and cabling, designed around the Manhattan base building.
installations over 10+ years
support for managed-service clients
Rated 4.9/5 by 110+ NYC corporations
Operating throughout New York
Security system installation in Manhattan, from our office on West 40th Street. Highline Integrated Security designs, installs, integrates and maintains commercial systems across the borough.
Security systems in Manhattan rarely start from a blank floor, so each one is scoped against the base-building systems already in place.

Access control
Card, mobile credentials (phone as badge), biometric and cloud access for tenant floors and base-building doors. We are a certified Salto dealer, LenelS2 partner and Software House dealer, and deploy Genetec and Dorma hardware. Detail is on our access control installation in Manhattan page.
Lobby entry
Turnstiles and optical speed lanes tied to LenelS2 OnGuard or C•CURE 9000, with visitor management at the lobby desk, so a badge works from street to suite.
Security cameras
NDAA-compliant Axis and Genetec cameras on exacqVision, with real-time alerts and remote monitoring from a phone or desktop. See our commercial security camera systems.
Intercom and entry
IP and cloud video intercoms that ring the tenant's phone and release the door.
Intrusion detection
Sensors, panic buttons and silent alarms, monitored to alert emergency services or security personnel, with video verification.
Cabling and network
Cat6/Cat6A, riser fiber and plenum-rated cable, tested and labeled through our structured cabling team, on a managed, segmented network.
Security system installation in Manhattan changes by district, because the building type sets the constraints.

| District | Typical buildings | What we plan for |
|---|---|---|
| Midtown and the Garment District | Class A towers and pre-war lofts around our West 40th Street base | Tenant systems matched to the landlord's platform |
| Hudson Yards | New Class A towers | Approved submittals, lobby turnstile integration |
| Financial District | Older office stock, some converted to mixed use | Legacy readers bridged or replaced without a shutdown |
| Flatiron, NoMad and Chelsea | Office lofts and creative floors | Exposed ceilings, so cable routing is designed, not improvised |
| Upper West Side and Lincoln Center | Theaters and pre-war buildings | Back-of-house access, work around performances |
| West 57th Street | Landmark halls near Carnegie Hall | LPC-sensitive hardware and finishes |
| Tribeca and SoHo | Cast-iron historic districts, independent schools | Limits on surface-mounted devices; phased work, as at Washington Market School |
| Harlem and 125th Street | Retail corridor, institutions, new mixed-use | Cameras integrated with point-of-sale, rolling security gates |
More on office security systems and cultural institution security.
Our Manhattan work spans venues and landmark buildings.

Access control, emergency alert systems and compliant wiring on the 5th floor, delivered through SPK/Lewis Construction. Read the Koch Theater project.

Custom heavy-duty hinges engineered for an oversized wooden freight door, delivered in 2025 with landmark approval. See the Carnegie Hall case study.

Heritage-style hardware carrying modern access control and IP intercom in a 19th-century Upper West Side brownstone, with Bridge Zale Construction, SyndicateBuild Architects and Cirgenski+Company. View the 627 West End Avenue project.
“I manage a commercial property in Midtown and we needed turnstiles installed for our lobby. Highline Integrated Security handled the full job including the cabling and panel work. They coordinated with our building super and finished within the timeframe they gave us. The turnstiles have been running without issues for three months now.”
Every system is backed by a 12-month warranty.
Planning work in a Manhattan building?
We will walk the doors, risers and approvals with you.
A Manhattan project succeeds or stalls on approvals and access, so we settle these before pricing is final.
Landlord rules and COIs
We prepare approved drawings and certificates of insurance in the format the building engineer expects.
DOB alteration filings
Where a fit-out runs under a Department of Buildings filing, our scope is coordinated inside the GC's filing.
Fire safety director and egress
In high-rise offices, door release changes are coordinated with the building's FDNY fire safety director and fire alarm vendor. Locks release on fire alarm activation and loss of power where required; we do not install fire alarm systems.
Freight and after-hours windows
Freight is booked by the slot and riser work runs after hours, so tenants keep working.
Riser and IDF capacity
We confirm pathway space and power in shared telecom rooms first.
Landmarks
LPC approval can apply in designated buildings and historic districts; wireless Salto locks and concealed routing keep visible change small.
The best commercial security partner in Manhattan owns the gap between the tenant system and the landlord's, because that is where most failures start.
Design and installation under one roof
The team that designs it should install it, test it with the base building and stay your contact.
Platform depth
Look for enterprise platforms that let a tenant system match the lobby.
Support after handover
We service all major brands, including systems others installed, and upgrade existing hardware rather than ripping it out.
Multi-site control
Several floors or buildings should run on one platform.
Manhattan projects follow the building's rules.
Doors, risers, IDFs and fire alarm interface points.
Compliance-led design, device schedule and platform, submitted for landlord approval and LPC review where it applies.
Scheduled around the building's rules; larger ones are phased by floor or after-hours window.
Every device tested, as-builts delivered, staff trained.
Managed service and maintenance, with 24/7 support for existing clients and a 4-hour response on critical failures.
FAQs
Short answers on landlord rules, cameras, choosing an integrator and cost.
Yes, we work within landlord building standards, insurance and approval rules on every Manhattan job. We prepare submittals and certificates of insurance, and match the tenant system to the base-building platform.
We offer security camera installation in Manhattan as part of an integrated system, not as a standalone camera service. Video is designed with access control, so each door event has footage beside it.
To choose between commercial security companies in Manhattan, look for one team that designs, installs and supports the system, deploys enterprise platforms your landlord uses, and services systems others installed. Ask for landmark and occupied-building references.
Business security systems in Manhattan cost according to door count, hardware, cabling pathways and platform. We price after a site assessment, because riser access and after-hours labor often move a budget most.
Tell us what the building needs. We'll design one system and support it after handover.