
David H. Koch Theater, Lincoln Center, with SPK/Lewis Construction
The brief. A 5th-floor upgrade at a performing arts venue, inside a GC-led project.
What we did. Access control, emergency alert systems and compliant wiring.
Result. The security scope had a single point of accountability. Read the Koch Theater case study


